SERVICES

  • HVAC
  • Electrical
  • Plumbing
  • Fire Fighting
  • Conceptual , Basic and Detailing of Engineering Services
  • Planning and Cost Control
  • Capital Equipment System Supplier Selection
  • Critical System Supplier Selection
  • Machinery Supplies / Exports
  • Air and Utilities Plan Design and Execution
  • Commissioning and Start Up
  • Basic Training

  • MEP Services
  • SITC of Fume Hoods
  • (As per AS 2243.8-1992 , Safety in laboratories fume cupboards)
    • Bench Type Fume Hoods
    • Low Bench Fume Hoods
    • Walk in Fume Hoods
    • Radio Isotope Fume Hoods
  • SITC of Furniture’s, Storage
    • Pedestal Based / C Frame
    • Based Furniture System
    • Educational Lab Furniture’s
    • Under Bench Cabinets
    • Worktops
    • Utility Taps
    • Spot Extractors
    • Reagent Racks
    • Chemical Storage Cabinets
    • Flammable Material Storage Cabinets
    • Filing Storage Cabinets
  • IT and Networking Systems
  • Flooring Systems
  • HVAC Systems
  • Modular Operation Theaters
    • Cieling construction and wall panels
    • Control Panel
    • Digital X-Ray Viewing screens
    • Hatch Box
    • Hermetic Doors
    • OT storage Units
    • Laminar Air Flows
    • X Ray Viewing Screen
  • (Modular Operation Theaters as per HTM 2025 Standard)
  • Hospital Equipment & Furniture
  • LV Critical Electrical System
  • Nurse Call Systems
  • Medical Gas Pipeline Systems
  • Epoxy Flooring
  • IT & Networking Systems

  • In-house Project Management
    • RAPL have complete, in-house, project management expertise, capable of taking a project from concept through to hand-over.
    • Our project managers are all specialists in Cleanrooms and Laboratories and fully understand the special requirements and attention to details required when constructing such facilities.
  • Programme and delivery
    • Each new project is allocated a dedicated project manager who will have direct control over a supporting team , including CAD draughtsmen, administrative staff and the site management and construction teams.
    • The project manager will oversee every aspect of the job and provide a single, consistent point of contact for the Client.
    • RAPL use experienced site managers that are trained to supervise the installation to our detailed construction program.
  • Daily Evening Project Progress Reporting.
  • Weekly Project Progress Client Reporting.
  • Procurement Report Submission on Weekly basis.
  • Fortnightly Tracking with Master Schedule.
  • Monthly Quantity and Price Variation Reports.
  • Any Design Variation report on every 25% project progress.
  • Trial Runs before handing over.
  • Validation and Documentation submission.
  • Handing over documents for handing over.
  • Training for using it.
  • Priority is given to the fulfilment of our obligations under Health and Safety both during construction and at the design phase.
  • RAPL can liaise with planning authorities and manage all aspects of Building Control on behalf of our Client’s. RAPL can fulfil any applicable role under the Regulations including, Consultants, Principal Contractor, Contractor and Designer.
  • Health and Safety is of critical importance and RAPL’s record in this area is impeccable. Whether we are acting as Principal Contractor or Contractor, we maintain a clean and tidy site and carry out regular site inspections and audits.
  • Our installation teams are given a complete site induction for each project and regular tool box talks are used to issue additional information or instruction.
  • RAPL can maintain a designated construction site, whether it be a new building or a laboratory refurbishment within a fully operational hospital or production facility.
  • Our comprehensive method statements and risk assessments, combined with our permit to work system, ensure our activities are properly planned and controlled.